Snowing Monday night and they are out clearing streets still (at this point wait until the snow event is over and then continue)
And just saw the grader go down one side of street, 15 min later the loader cleared those driveways all the while doing that, the grader just came down the same side of the street and filled all those driveway in again. Who hired this crew?? Talk about wasting tax dollars.
Edited by admin, 2022-01-18 06:08:53. Reason: required edit