Joined: Jul 2015
Posts: 327
WTH 26th st
11/20/2018 at 6:42 PM
So with the road construction finally done on the stretch of 26 from park to the tracks, one has to ask themselves, wth kinda job is that ? There is spots it’s not even at all, and heading south, just before the tracks in the left lane, is such a lip of pavement it damn near felt like it was taking my wheel off! Who would sign off on such a horrible job?