Joined: Mar 2011
Posts: 405
One would assume that if you had every detail on paper, every job listed, priced out and both parties signed, that should be what the cost is. If they got extra work done, or had to hire someone else outside the signed quote, then you may have to pay. But, just trying to get more money for a job that was quoted and signed for, I don't think they can do that. Above poster is right, contact a lawyer and show them all your paperwork.