Joined: Jun 2012
Posts: 252
Before you call
11/16/2015 at 11:04 AM
a contractor, call a registered structural engineer to visit and assess what the issue is and if possible design a repair to mitigate the issues. It could be some other portion of the structure causing movement issues. After that is done THEN you call a contractor to price and repair the issues.