Joined: Oct 2011
Posts: 327
Dept. Of Transportation and infrastructure
12/24/2015 at 11:36 AM
2 years to do this bridge work,likely 3 knowing this government.
A few years back, a bridge collapsed in Minneapolis and it was much bigger and took less than a year to replace.
Meanwhile,the Portage overpass on the west side is still not repaired after how long.
The government spent over 3 million on a new access road to Foxwarren,along with new 90 degree approaches / intersections onto highway 16 between Foxwarren and Binscarth.
Meanwhile a bridge south of Virden has been down to one lane for over 2 years.
( I guess that isn't a safety issue).
And as for 90 degree intersections, if anyone ever uses the highway 2-3 intersection out of Oak Bluff knows that intersection is very high traffic and is not even close to 90 degrees.
And there has been some horrendous accidents there.
The whole provincial transportation/ infrastructure team needs to be replaced at the top down in this province.
Incompetent just doesn't cut it.